References
Home | References
« pagging 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 »
Český rozhlas (state radio organization)
Project of the 2nd stage of the electric systems reconstruction as a part of the reconstruction of the buildings at 12 Vinohradská St. and 15 Římská St.
ČEZ, a.s.
- Installation of a structured cabling system including active elements. Installation and putting into operation of approx. 90 couplers of the cabling system - Praha 2 and approx. 60 couplers - Praha 3. Installation of cabling systems during and after the reconstruction of both buildings.
- Buildings: Praha 2, Fűgnerovo Sq. and Praha 3, Seifertova St.
ČKAIT
Installation and administration of Avaya PBXČSA a.s
Complete project documentation for the reconstruction of a hangar and construction of a base for the installation of fully movable Boeing B737 flight simulator
ČSL, s.p.
Prague Airport, Sever II Terminal
Designs of lighting of the airport areas, internal heavy-current and light-current distribution systems, and security systems.
D plus (general developer)
Zličín Shopping Centre
DHL Information services (Europe) s.r.o.
Structured cabling system
District Court for Prague 1 and 10
Installation of active elements - Enterasys (former Cabletron), installation of Systimax integrated distribution systems
District Courts in Královehradecký and Pardubický Regions
Installation of active elements - Enterasys (former Cabletron), installation of integrated distribution systems
« pagging 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 »
Navigace
Divisions References
- Communication and Information systems
- Transmission and control systems
- Electrical and electronic systems
- Technological Systems and Equipment
- Building Constructions and Engineering